Line Balancing with work simplification in Tablet Weighing area of the plant. Our Client is a global generic crop protection, chemicals and seeds company, headquartered in India (Mumbai). The three companies in that group, are listed on the Indian stock exchange, with a combined market capitalization of approx $2.5 billion.
Major challenge was environment of plant, lot of harmful gasses are there, Assessing Man power in each department and allocation of optimum man power in each workstation, Time and motion study setting the production norms, Balancing the assembly lines of stations by identifying the bottleneck and elimination, unavailability of skilled people was the major problem so to analyze the work method and de‐skilling the working method,improvement in existing layout to proper utilization of work place.
Refer Attachment for details of the case study